RHUB TM-510 Spezifikationen Seite 280

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 353
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 279
TM 9-2350-311-34-1
10-1 WINTERIZATION KIT INSTALLATION
— CONTINUED
a. Installation — Continued
70
71
72
73
74
Slide rear insulation blanket (161) over batteries. Guide free end of rear battery ground lead (circuit 7) (160)
through grommet (162) in blanket and position rear of blanket under rear winterization box tab (163).
Place front insulation blanket (164) over batteries, position outer side of blanket under rear winterization box
side tab (165) and position slot on inner side of blanket over stud (166) on front box. Install flat washers (167)
and wing nut (168) to stud.
Install rear battery ground lead (circuit 7) (160) to bulkhead with two existing screws and two Iockwashers.
Reroute left headlight wiring harness (169) and place on top of two blankets (161 and 164).
Check plug (170) to ensure installation in petcock valve (171) of lower main coolant tube.
Bleed coolant system.
10-20
Seitenansicht 279
1 2 ... 275 276 277 278 279 280 281 282 283 284 285 ... 352 353

Kommentare zu diesen Handbüchern

Keine Kommentare